This is an archived article and the information in the article may be outdated. Please look at the time stamp on the story to see when it was last updated.

Flooding caused by last night’s storm forced a temporary delay on the Riverwalk Renovation project in downtown Chicago.

The plan calls for a new walkway connection under the Dearborn Street Bridge.

Heavy rains raised Chicago River levels putting the construction area under water.

Work will resume once the water is drained or pumped out.