Flooding delays Riverwalk project

Flooding caused by last night’s storm forced a temporary delay on the Riverwalk Renovation project in downtown Chicago.

The plan calls for a new walkway connection under the Dearborn Street Bridge.

Heavy rains raised Chicago River levels putting the construction area under water.

Work will resume once the water is drained or pumped out.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 550 other followers